NASA GNEISS Rocket to Conduct ‘CT Scan’ of Auroral Electricity: NASA Updates.
Poker Flat Research Range: Launch Schedule.
ACS Attitude Control System.
CM Campaign Manager.
GBO Ground Base Observation.
LO Launch Officer.
LVT Vehicle Crew/Arming.
MM Mission Manager.
MT Mechanical Technician.
OSS Operations Safety Specialist.
PFRR Poker Flat Research Range.
PI Principal Investigator.
PGMR Programmer.
PLC 1 Payload Control – 36.397
PLC 2 Payload Control – 36.398
PTM Payload Telemetry Systems.
RIC Range Instrumentation Coordinator.
RSO Range Safety Officer.
SOC Science Operations Center.
SPC Swarm Payload Control.
SUR Surveillance.
STM Swarm Telemetry (Readout/TMA).
TD Test Director.
No comments:
Post a Comment